Difference between revisions of "Current Projects"
Jump to navigation
Jump to search
Line 1: | Line 1: | ||
== Warrior based projects == | == Warrior based projects == | ||
*[[Formspring]]: Announced March 15, supposedly shutting down April 15. IRC Channel '''#firespring''' | |||
*[[Formspring]]: Announced March 15, shutting down | |||
*[[Posterous]]: A blogging site shutting down April 30. IRC Channel '''#preposterus'''. Currently has the most attention. | *[[Posterous]]: A blogging site shutting down April 30. IRC Channel '''#preposterus'''. Currently has the most attention. | ||
Revision as of 04:38, 20 April 2013
Warrior based projects
- Formspring: Announced March 15, supposedly shutting down April 15. IRC Channel #firespring
- Posterous: A blogging site shutting down April 30. IRC Channel #preposterus. Currently has the most attention.
Manual projects
- Gamespy, 1up, UGO, IGN: Shutdown date unknown, announced Feb 21, 2013. IRC Channel #ispygames.
Progress
We have an online tracker that lists currently running warrior projects.